Stay informed and inspired with our latest articles on architecture, design trends, and industry insights. Explore our blog to find valuable information and creative ideas for your projects.
Check out all Blogs. 👇
Speculating on the future of arches in architecture, this article examines emerging trends, materials, and innovations that could redefine how arches are used in the coming years.
A cultural exploration of arches, detailing their symbolic meanings and importance in various societies throughout history, from religious symbols to representations of power and unity.
An in-depth look at the engineering principles behind arches, highlighting their strength, stability, and why they continue to be a favored element in construction.
A showcase of some of the world’s most famous buildings that prominently feature arches, from ancient landmarks like the Colosseum to modern architectural marvels.
Yes. All steel supplied by HUIS Group is fabricated to meet or exceed relevant AS/NZS standards, including:
• AS/NZS 5131 – Fabrication & Erection• AS 4100 – Steel Structures• AS/NZS 3678 / 3679 / 1163 – Plates, Sections, and Tubes• AS/NZS 1554.1 – Welding
We also provide SGS and third-party inspection certificates and ACRS-ready documentation if required. Any further ISO standards required can be provided as required.
We have Australian-trained QA teams embedded at our partner factories. In addition, we engage independent third-party inspectors (SGS or equivalent) to verify every order before shipment. QA includes weld checks, dimensional control, material traceability, and coating verification
Every order includes a full QA and compliance pack:
• Mill Test Certificates (MTCs)• Welding and coating reports• Dimensional & NDT reports (if applicable)• Batch traceability logs• Packing lists and QR-coded item IDs
Yes. We offer door-to-door delivery across Australia, including sequencing to align with your install program. Our logistics service includes packing, shipping, insurance, customs clearance, and transport to your jobsite - or storage if required.
Our steel supply is most economical for orders of 20 tons or more. For anything below 20T, we’ll advise whether local supply may be more cost-effective.
Lead times vary by scope, finishing requirements, and project location:
• fabrication timeframes are determined during scoping• sea freight port to port starts from 30 days
We work closely with you to align deliveries with your program.
You’ll deal directly with the HUIS Group team in Australia from start to finish — no offshore handballing or lost-in-translation issues. Our team includes commercial managers, QA leads, and project coordinators who understand your build, your schedule, and your expectations.